Quality Checks Linked to the Order project reference

Quality control

Quality Checks Linked to the Order

Putian links incoming-material, production, final and loading checks to the confirmed modular building system, specification and destination requirements.

Request a project quote Original Putian workshop finishing photograph, August 2026

Incoming materials

Check material identification, dimensions, appearance and order-linked documents before release to production.

In-process control

Review frame geometry, welding, surface preparation, panel fit and installed components at defined stages.

Final and loading checks

Confirm configuration, quantity, appearance, accessories, packing marks and loading evidence before shipment.

BUYER CHECKLIST

Inspection records should follow the confirmed order

The useful question is not whether a factory has “quality control,” but which checks apply to your model, when they happen and what order-linked evidence can be supplied.

Send these details to Putian
  1. Approved drawing revision and order identification
  2. Incoming material and component checks
  3. Frame dimensions, welding and surface preparation
  4. Panel, opening and service-route inspection
  5. Final configuration, quantity and accessory check
  6. Packing marks, loading list and shipment evidence

COMMON QUESTIONS

What to confirm before ordering

Final answers depend on the selected model, destination and written order scope.

Can buyers request inspection records before shipment?

Available records can be agreed for the order. Their format and scope depend on the selected product, contract, inspection plan and publication or confidentiality limits.

Does one certificate cover every product and destination?

No. A certificate applies only to the named product, standard, model and scope shown on that document. Destination approval requirements should be confirmed before the order is finalized.

Can a third party inspect the order?

A buyer-appointed inspection can be discussed in advance so access, timing, inspection criteria, cost and the release procedure are written into the order plan.

Next step

Prepare a project-specific response.

Tell us the country, application, quantity and target schedule.

Start your project

FROM EVIDENCE TO ACTION

Continue Your Supplier Review

Use the factory information together with product, planning and written quotation details.