Quick-Assembly Container Houses project reference

Detachable bolted-component system

Quick-Assembly Container Houses

Known as a detachable container house in the quotation sheet, this format ships the frame, wall panels and accessories as separate components for bolted assembly at the destination.

Request a project quote AI-assisted visualization based on the Putian quick-assembly system reference

Quotation reference

The current quotation sheet uses 3000 × 5990 × 2890 mm as the assembled product reference. Packing and loading depend on the selected wall-panel option.

Different from flat-pack

This format is loose-packed for more component-by-component site assembly. Confirm every frame, panel, fastener and accessory against the packing list.

Installation readiness

The project plan should define site access, foundation, lifting, tools, crew, assembly sequence and local utility connections.

QUICK-ASSEMBLY PLANNING

Organize the Components Around the Site Plan

This bolted-component format can support repeatable room and project layouts when packing control and site assembly are planned together.

Repeatable room module

Standard Unit

Confirm frame members, panels, fasteners, seals, openings and the full packing list.

Ask about this option →
Accommodation or office layout

Combined Building

Coordinate module interfaces, circulation, weather sealing and shared service routes.

Ask about this option →
Phased delivery and assembly

Project Block

Plan foundations, component identification, storage, tools, crew and installation sequence by phase.

Ask about this option →

The current quotation reference uses 3000 × 5990 × 2890 mm. Component breakdown and loading depend on the confirmed wall-panel option.

BUYER CHECKLIST

Plan component assembly at the destination

The detachable system arrives as more separate components than an integrated module. Packing control and site organization are therefore essential.

Send these details to Putian
  1. Frame members and connection details
  2. Panel type, insulation and finish
  3. Fastener, seal and accessory schedule
  4. Door, window and service-opening locations
  5. Packing list and component identification
  6. Tools, lifting, crew, foundation and assembly sequence

COMMON QUESTIONS

What to confirm before ordering

Final answers depend on the selected model, destination and written order scope.

How is this different from flat-pack?

Both involve site assembly, but component breakdown, packing method and connection details differ. Confirm the named system and its full packing list.

Can modules be combined into larger buildings?

Combinations can be reviewed against the approved layout, structural arrangement, circulation, utilities and local project requirements.

Next step

Prepare a project-specific response.

Tell us the country, application, quantity and target schedule.

Start your project

CONTINUE YOUR REVIEW

Move from Product Format to a Confirmed Project Brief

A reference image is only the starting point. Check capability and send the details needed for a written configuration.