Detachable structure for flexible combinations
This system is assembled from separate structural and enclosure components at the project site. It is different from a folded integrated unit and from a double-wing expandable house, so transport dimensions, labour, tools and assembly time must be assessed independently.
What the project team should confirm
Before quotation, define the module arrangement, number of storeys, corridor and stair requirements, occupancy, door and window schedule, internal partitions, wet areas and utility connections. Structural connections, foundations and anchoring depend on the destination and intended use.
Delivery and installation records
A complete order should include a packing list, labelled components, assembly drawings, fastener schedule and the agreed installation scope. Loading quantity is not published here until it is confirmed for the selected version and packing method.
The image is a format reference. Materials, dimensions and appearance are finalized through the quotation, drawings and contract.
