Flat-Pack Houses

Flat-Pack Container House Module Kit

A flat-pack modular building kit in which frames, columns, wall panels and accessories are organized for transport and site assembly.

Reference configuration
Model / reference number
Flat-pack module kit reference
Layout / intended use
Accommodation, office, dormitory, retail or support space
Delivery form
Stacked module kit for site assembly
Installation scope / conditions
Assembly sequence, lifting tools and site labour confirmed per project
Custom options
Module combination, openings, panels, internal layout and services

The photographed unit is a reference. Final dimensions, materials, performance, packing and delivery are confirmed by drawings, PI and contract.

Specification review: Putian product documentation team · 2026-10-07

Organized component kit for modular site assembly

A flat-pack system transports the primary frame members, columns, wall panels and accessories as an organized kit. It should not be described as a complete double-wing or Z-folding unit because its packing and assembly logic are different.

Scope that must be written into the quotation

The buyer and factory should confirm which frame members, panels, fasteners, seals, doors, windows, electrical items, sanitary items, tools, drawings and installation services are included. Packing lists and part labels are important when one shipment serves a multi-module project.

Site planning

  • Foundation levels and anchoring points
  • Crane, forklift or manual handling plan
  • Weather protection during assembly
  • Panel joints, roof drainage and service penetrations
  • Connections between modules and storeys

The displayed image is a system-format visualization. Final dimensions and components follow the approved model and bill of materials.

Before you compare prices

Make the Supply Boundary Clear

The final quotation, approved drawings, specification, PI and contract define the actual supply. These three groups prevent assumptions from becoming order disputes.

01

Factory supply

The selected structure, enclosure, openings, accessories and factory-installed items must be listed in the quotation and bill of materials.

02

Confirmed for this order

Exact dimensions, layout, materials, finishes, services, packing method and loading arrangement follow the approved project documents.

03

Destination and site scope

Permits, foundations, unloading, lifting, site assembly, utilities and final connections remain project-specific unless the contract states otherwise.

Before ordering

Product Quotation FAQ

Is the photographed unit available exactly as shown?

It is presented as a reference configuration. Availability and the final specification must be confirmed for the current order.

Can the layout, doors, windows and finishes be changed?

These items can be discussed during configuration review. Feasibility and cost depend on the selected product system and destination requirements.

What information is needed for a quotation?

Please send the destination country, application, quantity, preferred dimensions, layout, options and target schedule.

CONTINUE YOUR REVIEW

Move from Product Format to a Confirmed Project Brief

A reference image is only the starting point. Check capability and send the details needed for a written configuration.